Phase
7 - Equipment Delivery and Installation:
After the decking has been completed, the pool equipment will be delivered. The plumbing crew will return to install the equipment. Do not touch any valves or controls. After the equipment has been installed, the electrician will return to complete the wiring and bonding. Once the electrical hookup is completed, all power must remain "off." Under "no" circumstances should the power be turned on to any of the equipment because it will cause damage to the pump(s) or light(s). FACTS:
|
Building our Swimming PoolPhase 2 - Structural Steel Placement Phase 5 - Tile, Masonry, Rockwork Phase 6 - Decking and Keystone |
Equipment installed: Two Super II pumps and Sta-Rite System 3™ Modular Media Filter.